2017 - 2017

  • ARI was recognized by CIDB as “Pusat Latihan Bertauliah Installer IBS Installer” for IBS Metal Structure Framing System.
  • ARI further updated its quality commitment to ISO 9001:2015.
  • ARI’s “Composite Floor Slab System” was certified by Jabatan Bomba Dan Penyelamat Malaysia for 2 hours fore resistance.
  • ARI’s “Mega Rib 30 PU Metal” was certified by Jabatan Bomba Dan Penyelamat Malaysia for fire resistance Class ‘O’.
  • ARI was certified by CIDB as an IBS Status company manufacturing the IBS components, Lightweight Frame Building and Metal Roof Trusses.
  • Strategic collaboration with Politeknik Melaka for the establishment of an academic collaboration in program and activities based on Industrialised Building System (IBS) concept.
  • Collaboration with Ascension Technology Sdn Bhd to promote affordable housing in Malaysia by using innovative construction technique.
  • ARIU was patented “Light Weight Wall Structure” in 2017.
Scroll To Top